西南石油大学学报(自然科学版) ›› 2009, Vol. 31 ›› Issue (1): 103-106.DOI: 10.3863/j.issn.1674-5086.2009.01.025

• 石油与天然气工程 • Previous Articles     Next Articles

NEW-TYPE HORIZONTAL WELL COMPLETION METHOD OF DELAYING AND CONTROLLING BOTTOM WATER CONING

XIONG You-ming1 LUO Dong-hong2 TANG Hai-xiong2 WEI Hong-an2 ZHANG Lin1

  

  1. 1.The Center for Well Completion Techniques of Southwest Petroleum University,Chengdu Sichuan 610500,China;2.Shenzhen Branch of CNOOC Ltd,Shenzhen Guangdong 518067,China
  • Received:1900-01-01 Revised:1900-01-01 Online:2009-02-20 Published:2009-02-20

Abstract:

A new-type horizontal well completion method of delaying and controlling bottom water coning is developed because of the two problems of bottom water coning and water plugging later in bottom water oil fields.and the new well completion method adopts the mode of arrangement of intervals of blank tubing with ECP in the two ends and screened pipe,which seals off well annulus by ECP,delayes bottom water coning by long blank tubing,and conveniently seals off intervals,and proivdes a new train of thought and forms a complete well completion system for developing the bottom water oil fields of the reef limestone in extended-reach horizontal well completion in South China Sea reasonably.

Key words: horizontal well, well completion, external casing packer (ECP), bottom water coning, water plugging

CLC Number: