Journal of Dali University ›› 2021, Vol. 6 ›› Issue (5): 115-.
Previous Articles Next Articles
Online:
Published:
Abstract: The establishment and improvement of performance evaluation system is an inevitable requirement for the standardized operation of PPP projects, and it is also an important measure for the reform of national financial budget system. The performance evaluation index system for municipal engineering projects is of great practical significance to provide high-quality public basic services. Based on the theory of BSC, the performance evaluation system of PPP project in operation period is constructed. The weight and quantity value of indicators are determined by improved GAHP and fuzzy comprehensive evaluation method. Practical cases are used to verify the feasibility of the evaluation system, broaden the application scope of the balanced scorecard, and provide a theoretical and practical basis for the performance evaluation of municipal engineering PPP projects during the operation period.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://journal15.magtechjournal.com/Jwk_dlxyzk/EN/
http://journal15.magtechjournal.com/Jwk_dlxyzk/EN/Y2021/V6/I5/115