西南石油大学学报(自然科学版) ›› 2004, Vol. 26 ›› Issue (2): 11-14.DOI: 10.3863/j.issn.1000-2634.2004.02.004
• 石油与天然气工程 • Previous Articles Next Articles
XIE Xian-jun1 LIUZhi-bin1 DUYu-hong2 et al.
Received:
Revised:
Online:
Published:
Contact:
Abstract: The correlative relationship of the development index of oilfield can be established by use of functional simulation theory(such as differential simulation method and NN method), the authors re-searched the oilfield(oil production plant or development unit) and set up the optimal models of measure structure with different goals,including maximum measure oil-output(fixed measure workload ,fixed measure cost);minimum measure cost(fixed measure oil-out-put,fixed measure workload) and maximum economic benefit(fixed measure workload, fixed measure oil-output, fixed measure cost),which solved the optimal structure problems successfully with each subentry measure oil-output (usually contained fracture oil-output、acidification oil-output、overhaul oil-output、other measure oil-output and so on) and the corresponding measure workload and other de-velopment index of oilfield (or oil production plant). The satisfacto-ry economic benefit can be obtained that applied the models into de-velopment programming in some oilfield, which was in the mid-late stage.
Key words: development programming, measure structure, measure cost, economic benefit, optimal model
CLC Number:
TE32
XIE Xian-jun LIUZhi-bin DUYu-hong et al.. THE MODELLING AND APPLICATION OF PLANNING MEASUREMENT AND STRUCTURE OPTIMATION OF OILFIELD PRODUCTION[J]. 西南石油大学学报(自然科学版), 2004, 26(2): 11-14.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://journal15.magtechjournal.com/Jwk_xnzk/EN/10.3863/j.issn.1000-2634.2004.02.004
http://journal15.magtechjournal.com/Jwk_xnzk/EN/Y2004/V26/I2/11