西南石油大学学报(自然科学版) ›› 1996, Vol. 18 ›› Issue (3): 94-97.DOI: 10.3863/j.issn.1000-2634.1996.03.014
• 石油机械工程 • Previous Articles Next Articles
WangWei
Received:
Revised:
Online:
Published:
Contact:
Abstract: In this paper,on the basis of beam strength theorythe author presents the modifying-moment method,by which allowable erosion length of a sea-bottom imbeded oil pipeline can be obtained easily.The example in the paper shows that the calculation is simple and the result is reliable.Thus the method is practical in engineering.
Key words: Submaring pipeline, Scouring action, length
CLC Number:
TE873.1
WangWei. A Practical method of Obtaining Allowable Erosion Length of Sea-Bottom Imbeded Oil Pipeline[J]. 西南石油大学学报(自然科学版), 1996, 18(3): 94-97.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://journal15.magtechjournal.com/Jwk_xnzk/EN/10.3863/j.issn.1000-2634.1996.03.014
http://journal15.magtechjournal.com/Jwk_xnzk/EN/Y1996/V18/I3/94