西南石油大学学报(自然科学版) ›› 2007, Vol. 29 ›› Issue (2): 100-102.DOI: 10.3863/j.issn.1000-2634.2007.02.027

• 石油与天然气工程 • Previous Articles     Next Articles

THE TECHNOLOGIES FOR HIGH EFFICIENT DEVELOPMENT OF LOW PERMEABILITY RESERVOIR

LIANG Zhu 1,2 SHEN Zhi-jun 2,3 QI Mei 2,3 et al.

  

  1. (China Mining Technology University, Beijing 100083,China)
  • Received:2006-09-06 Revised:1900-01-01 Online:2007-04-20 Published:2007-04-20

Abstract: Northern Baolang Block in Baolang oilfield is taken as an example to indentify the steep structures by using wave equation cascade depth migration processing technique, idfentify the fractures by using log information and palaeotectonic stress field analysis,predict the reservoirs laterally by using reflection amplitudethickness and wavelet processing technique. Base on the establishment of fine geologic model and research on reasonable well space, the comprehensive adjustment and bridge plugging of low permeability reservoirs and whole reservoir protection under tubing survey perforating techniques are presented. anti gas rod pump mechanical production technology resolves high gas oil ratio. Multilevel stamping acidizing and individual layer acidizing at high pressure resolves the problem of low permeability reservoir hygroscope difficulty. During oilfield development, a whole set of high efficient development technology for low permeability reservoirs is formed. Oilfield application acquires preferable effectiveness.

Key words: Baolang oilfield, low permeability, high efficient development, related technology, applied effectiveness

CLC Number: