西南石油大学学报(自然科学版) ›› 2009, Vol. 31 ›› Issue (2): 105-108.DOI: 10.3863/j.issn.1674-5086.2009.02.027

• 石油与天然气工程 • Previous Articles     Next Articles

THE METHOD OF PILOT SCREENING AND EVALUATING RESERVOIR WITH CO2 INJECTION

DENG Bo LI Hong CAO Jian ZHOU Jian LI Qin

  

  1. Northwest Sichuan Gas Field of Southwest Petroleum Company,CNPC,Jiangyou Sichuan 621709,China
  • Received:1900-01-01 Revised:1900-01-01 Online:2009-04-20 Published:2009-04-20

Abstract: The indicator system of screening and evaluating reservoirs prior to CO2injection is a very important research target,because of the heterogeneity of reservoir property and human factors,in order to screen and evaluate the selected reservoirs with CO2 injection,the comprehensive evaluation method which can reflect the potential of CO2 injection reservoirs with dual uncertain condition is set up based on the gas injection evaluation indicator system established with reservior geology and fluid property etc.,and the multi-factor decision-making method under the dual uncertain condition is introduced,the method can be used in screening and evaluating the reservoirs prior to injecting different media to improve CO2flooding and enhance recovery.

Key words: CO2 injection, pilot, screen reservoir, method, evaluation, IOR

CLC Number: