Drilling Site Risk Assessment Based on Bayesian Network
Wang Bing1*, Yang Xiaoying2, Zhao Chunlan3, Xiao Bin1
1. School of Computer Science,Southwest Petroleum University,Chengdu,Sichuan,610500,China
2. School of Petroleum and Natural Gas Engineering,Southwest Petroleum University,Chengdu,Sichuan 610500,China
3. School of Science,Southwest Petroleum University,Chengdu,Sichuan 610500,China
Wang Bing1*, Yang Xiaoying2, Zhao Chunlan3, Xiao Bin1. Drilling Site Risk Assessment Based on Bayesian Network[J]. 西南石油大学学报(自然科学版), DOI: 10.11885/j.issn.1674-5086.2014.09.01.02.
[1] 中国石油天然气集团公司质量安全环保部. HSE 风险管理理论与实践[M]. 北京:石油工业出版社,2009.[2] 谢传欣,叶从胜,黄飞. 国内外井喷事故回顾[J]. 安全、健康和环境,2004,4(2):9 – 19.[3] 董国永,刘景凯. 中国石油集团公司HSE 管理体系运行模式的研究[J]. 中国安全生产科学技术,2005,1(3):47 – 51.Dong Guoyong,Liu Jingkai. CNPC′s HSE-MS model establishmentand practice[J]. Journal of Safety Science andTechnology,2005,1(3):47 – 51.[4] 李巍,张震. 油田生产环境安全评价与管理[M]. 北京:化学工业出版社,2005.[5] 刘景凯. 基于管理实践的HSE 管理体系建设研究[J].中国安全生产科学技术,2008,4(2):99 – 102.Liu Jingkai. Study on HSE-MS establishment based onmanagement practice[J].Journal of Safety Science andTechnology,2008,4(2):99 – 102.[6] 张明广,蒋军成. 基于层次分析法的重大危险源模糊综合评价[J].南京工业大学学报,2006,28(2):31 – 34.Zhang Mingguang,Jiang Juncheng. Application of analyticalhierarchy process in hazard degree assessment ofmajor hazard installations[J]. Journal of Nanjing Universityof Technology,2006,28(2):31 – 34.[7] 崔文彩. 钻井工程HSE 危害识别与风险评价模式研究[D]. 武汉:中国地质大学,2008.[8] 赵春兰,王兵,郭平. 基于ARIMA 模型的钻井作业风险预测[J]. 新疆石油地质,2013,34(4):469 – 472.Zhao Chunlan,Wang Bing,Guo Ping. The risk probabilityprediction of drilling operation site using ARIMAmodel[J]. Xinjiang Petroleum Geology,2013,34(4):469 – 472.[9] 何学秋. 安全工程学[M]. 徐州:中国矿业大学出版社,2000:23 – 36.[10] 蒋希文. 钻井事故与复杂问题[M]. 第2 版. 北京:石油工业出版社,2006.[11] 刘玉石,白家址,周煜辉,等. 考虑井壁岩石损伤时保持井眼稳定的泥浆密度[J]. 石油学报,1995,16(3):123 – 128.Liu Yushi,Bai Jiazhi,Zhou Yihui,et al. Mud density forwellbore stability when formation rock is damaged[J]. ActaPetrolei Sinica,1995,16(3):123 – 128.[12] 刘菊梅,王宏图,李文华,等. 陆上油气钻井作业评价指标体系的构建[J]. 油气田地面工程,2009,28(8):28 – 29.[13] 郭杰. 钻井施工现场风险源分析与风险控制措施[J]. 内蒙古石油化工,2010,(20):31 – 33.[14] 赵全民,樊建春,张洪. 天然气钻井人因失误事故风险定量评价方法[J]. 天然气工业,2012,32(7):80 – 83.Zhao Quanmin,Fan Jianchun,Zhang Hong. Quantitativerisk evaluation of human factors and failures in the gasdrilling industry[J]. Natural Gas Industry,2012,32(7):80 – 83.[15] 田岚. 石油天然气钻井工程风险识别与评价方法[J]. 钻采工艺,2010,33(2):31 – 33.Tian Lan. Risk identification and evaluation method indrilling engineering[J]. Drilling & Production Technology,2010,33(2):31 – 33.[16] 李美求,周思柱. 基于模糊综合评价法的钻井作业安全性评价[J]. 石油化工安全技术,2006,22(6):5 – 7.Li Meiqiu,Zhou Sizhu. Safety assessment of drilling wellbased on the fuzzy integrative evaluate method[J]. Petrochemical Safety Technology,2006,22(6):5 – 7.[17] 张连文,郭海鹏. 贝叶斯网引论[M]. 北京:科学出版社,2006.[18] Lockamy III A,McCormack K. Modeling supplier risksusing Bayesian networks[J]. Industrial Management &Data Systems,2012,112(2):313 – 333.[19] Maiti S,Tiwari R K. Automatic discriminations amonggeophysical signals via the Bayesian neural networks approach[J]. Geophysics,2010,75(1):E67 – E78.[20] Abedi M,Norouzi G H. Integration of various geophysicaldata with geological and geochemical data to determineadditional drilling for copper exploration[J]. Journalof Applied Geophysics,2012,83:35 – 45.[21] Lan B,Persaud B. Evaluation of multivariate Poisson lognormal Bayesian methods for before-after road safety evaluations[J]. Journal of Transportation Safety & Security,2012,4(3):193 – 210.[22] Heckerman D,Geiger D,Chickering D M. LearningBayesian networks: The combination of knowledgeand statistical data[J]. Machine learning,1995,20(3):197 – 243.[23] Cooper G F,Herskovits E. A Bayesian method for the inductionof probabilistic networks from data[J]. MachineLearning,1992,9(4):309 – 347.[24] Martins M R,Maturana M C. Application of Bayesian beliefnetworks to the human reliability analysis of an oiltanker operation focusing on collision accidents[J]. ReliabilityEngineering & System Safety,2013,110:89 – 109.[25] Wilson A G,Huzurbazar A V. Bayesian networks formultilevel system reliability[J]. Reliability Engineering &System Safety,2007,92(10):1413 – 1420.