THE WELL TEST INTERPRETATION OF PARTIALLY PERFORATED VERTICAL WELL IN THIN BED BOTTOM WATER RESERVOIR
LI Cheng-yong LIU Qi-guo ZHANG Lie-hui ZHANG Ran ZHANG SHeng- bing
西南石油大学学报(自然科学版) . 2007, (1): 79 -81 .  DOI: 10.3863/j.issn.1000-2634.2007.01.023