APPLICATION OF TRY AND DERROR METHOD TO TREATMENT ON WELLHEAD PRESSURE BUILD UP CURVE ABNORMALITY OF GAS WELL
SU Yun-he DU Zhi-min GUO Xiao LAN Sheng-wu SONG Hai-jing
西南石油大学学报(自然科学版) . 2009, (6): 101 -104 .  DOI: 10.3863/j.issn.1674-5086.2009.06.022