西南石油大学学报(自然科学版) ›› 1988, Vol. 10 ›› Issue (3): 11-16.DOI: 10.3863/j.issn.1000-2634.1989.03.002

• 地质勘探 • 上一篇    下一篇

利用圆域法进行电算地改值的进一步探讨

杨再朝
  

  1. (石油勘探系)
  • 收稿日期:1989-01-21 修回日期:1900-01-01 出版日期:1988-08-20 发布日期:1988-08-20
  • 通讯作者: 杨再朝

FURTHER STUDY OF CALCULATING THE TERRAI CORRECTION . VALUE BY CIRCULAR ZONE METHOD

Yang Zai-chao
  

  1. (Dept.of Exploration)
  • Received:1989-01-21 Revised:1900-01-01 Online:1988-08-20 Published:1988-08-20
  • Contact: YangZai-chao

摘要: 本文讨论了重力测量中的方域地形校正方案存在的不足,提出了用矩形网络的高程数据进行圆域地形校正的方案。在计算时对比了方域地形校正结果(用一压缩物质线和二维数值积分法计算〔1))和国域地形校正结果与真值之差后,认为本文所提的方案是可行的。

关键词: 方域, 圆域, 矩形网络, 数据, 地形校正

Abstract: In this paper,we have discussed the dra wback which exists in the squ-
are zone terrain correction scheme, and presented the circular zone terrain
correction scheme based on the altitude data of the rectangular net.After
comparing the differene between real values with the ,calculated values of
the square zone terrain correction(by means of the compressed mass line
and the 2-D numerical integration),and of the circular zone terrain cor-
iection, we think that the scheme presented here is feasible.

Key words: square region, circuit region, rectangles grid data, tertain carrectior