Study on the Change of Fluid Production of High Water-cut Stage in
Different Producing System
Liu Huanle1, Wu Zexin2*, Zhang Bo3, Wu Xiaoyu4
1. Sinopec Research Institute of Petroleum Engineering,Chaoyang,Beijing 100101,China;2. CNPC Greatwall Drilling Company Geology Research
Institute,Panjing,Liaoning 124010,China;3. Development Department of Tarim Oilfield Company,PetroChina,Korla,Xinjiang 841000,China;
4. Well Testing Department of CNPC Greatwall Drilling Company,Chaoyang,Beijing 100101,China
Liu Huanle1, Wu Zexin2*, Zhang Bo3, Wu Xiaoyu4. Study on the Change of Fluid Production of High Water-cut Stage in
Different Producing System[J]. 西南石油大学学报(自然科学版), DOI: 10.11885/j.issn.1674-5086.2012.10.18.01.
[1] Blasingame T A,McCray T L,Lee W J. Decline curveanalysis for variable pressure drop/variable flowrate systems[C]. SPE 21513,1991.[2] Timmerman E H. Petroleum Engineering[M].New York:Academic Pr.,1971:77– 78.[3] 万新德. 注聚后水驱油藏含水变化规律研究[J]. 大庆石油地质与开发,1986,12(5):37–44.Wan Xinde. Study on water cut change of water drive oilreserves after polymer flooding[J]. Petroleum Geology &Oilfield Development in Daqing,1986,12(5):37–44.[4] 周学民,任玉林,王者琴. 高含水后期油田产液量变化趋势研究[J].石油勘探与开发,1994,21(1):95– 98.Zhou Xuemin,Ren Yulin,Wang Zheqin. A study of thevariation of total liquid production of an oil field in itslater high water cut stage[J]. Petroleum Exploration andDevelopment,1994,21(1):95– 98.[5] 胡建国,陈元千,张盛宗.预测油气田产量的新模型[J].石油学报,1995,16(1):79–86.Hu Jianguo,Chen Yuanqian,Zhang Shengzong.A newmodel to predict production rate of oil and gas fields[J].Acta Petrolei Sinica,1995,16(1):79– 86.[6] 陈元千. 预测水驱油田开发指标及可采储量的联解法[J].新疆石油地质,1997,18(2):147–152.Chen Yuanqian. Combined solution for forecasting waterdrive development index and recoverable reserve [J]. XinjiangPetroleum Geology,1997,18(2):147–152.[7] 陈元千. 水驱油田开发指标的预测方法[J].断块油气田,1998,5(3):29–33.Chen Yuanqian.The forecasting method of developmentindexes in water-drive oil field[J].Fault-block Oil & GasField,1998,5(3):29– 33.[8] 陈元千. 预测水驱油田开发动态的一种方法[J].石油勘探与开发,1998,25(1):43–46.Chen Yuanqian.A method for forecasting developmentperformance of water drive oil field[J]. Petroleum Explorationand Development,1998,25(1):43– 46.[9] 陈元千. 广义翁氏模型与水驱曲线的联解法[J]. 新疆石油地质,1999,20(2):134 –140.Chen Yuanqian.Combined solution of generalized Wengmodel and water drive curve[J]. Xinjiang Petroleum Geology,1999,20(2):134–140.[10] 陈元千,赵庆飞.Weibull 预测模型与乙型水驱曲线的联解法[J]. 新疆石油地质,2000,21(5):405– 407.Chen Yuanqian,Zhao Qingfei.Combined solution of generalizedWeibull model and B water drive curve [J]. XinjiangPetroleum Geology,2000,21(5):405– 407.[11] 陈元千,赵庆飞.Hubbert 模型与水驱曲线联解法[J].中国海上油气(地质),2001,15(3):194– 198.Chen Yuanqian,Zhao Qingfei. Combined solution of generalizedHubbert model and B water drive curve[J]. ChinaOffshore Oil and Gas(Geology),2001,15(3):194– 198.[12] 景爱霞.不同类型油藏产液量变化规律分析及趋势[J].江汉石油学院学报,2003,25(5):82–85.Jing Aixia.Research on fluid production variation analysisand trend prediction about different types of reservoir[J]. Journal of Jianghan Petroleum Institute,2003,25(5):82–85.[13] 韩军,侯君,薛宗浩,等. 葡萄花油田高含水期开发技术政策界限研究[J]. 西安石油大学学报:自然科学版,2004,1(5):44– 48.Han Jun,Hou Jun,Xue Zonghao,et al. Research on developmenttechnology policy limit in high water-cut stagein Potaohua oilfield[J]. Journal of Xi′an Shiyou University:Natural Science Edition,2004,1(5):44– 48.[14] 刘美佳,宋考平,张建国. 一种预测聚合物驱含水率及可采储量的简单方法[J]. 石油钻探技术,2007,35(5):98–100.Liu Meijia,Song Kaoping,Zhang Jianguo. A simplemethod to predict water cut and recoverable reservesin polymer flooding[J]. Petroleum Drilling Techniques,2007,35(5):98–100.[15] 刘朝霞,韩冬,王强. 一种预测聚合物驱含水率的新模型[J]. 石油学报,2009,30(6):903– 906.Liu Zhaoxia,Han Dong,Wang Qiang. A new model forwater cut prediction in polymer flooding[J]. Acta PetroleiSinica,2009,30(6):903 –906.[16] 吴书成,刘明,王云献,等.通过注水受效分析优化油井产液量[J].新疆石油地质,2010,31(2):178 –180.Wu Shucheng,Liu Ming,Wang Yunxian,et al. Mass productionoptimization based on analysis of water flood response[J].Xinjiang Petroleum Geology,2010,31(2):178– 180.[17] 刘欢乐,吴则鑫,张博,等.油田生产制度改变时产液量变化规律预测[J].石油钻探技术,2013,41(5):102-105 Liu Huanle,Wu Zexin,Zhang Bo,et al. Regularityforecast for liquid production change when changingproduction parameters[J]. Petroleum Drilling Techniques,2013,41(5):102 –105.