西南石油大学学报(自然科学版) ›› 1996, Vol. 18 ›› Issue (4): 62-66.DOI: 10.3863/j.issn.1000-2634.1996.04.012

• 油气田开发 • Previous Articles     Next Articles

Sudy of Development plan for Natural Gas of Strippled Wells in chuan Gas Fields

Tang Xiao-dong Meng ying-feng et al
  

  1. Dept. of Chemical Engineering, SWPI, Sichuan, 637001
  • Received:1995-12-01 Revised:1900-01-01 Online:1996-11-20 Published:1996-11-20

Abstract:

view of the fact that the gas of the stripped wells has not been developed, this paper presents a preliminary sibility plan of its development and utilization by adopting the techniques of solid desulfurizing agent(SDA), ssureswing absorption (PSA), absorption natural gas (ANG) and natural gas vehicle (NGV). Through lysis, evaluation and comparison, it is considered practical and feasible to store and transport the gas in steel inders after it is purged and absorbed by a skid-mounted gas purification plant. The gas can be used fuel for icles and in daily life, and as a fuel of vehicles, it has great benefiits in economy, society, and environmental tection.

Key words: Stipped well, Natural gas, Development plan

CLC Number: