西南石油大学学报(自然科学版) ›› 2007, Vol. 29 ›› Issue (1): 64-67.DOI: 10.3863/j.issn.1000-2634.2007.01.019
• 石油与天然气工程 • Previous Articles Next Articles
DUAN Yong-gang CHEN Wei LI Yun HU Yong LUO Tao
Received:
Revised:
Online:
Published:
Contact:
Abstract:
The productivity in Luojiazhai gas reservoir is analyzed and forecasted according to its reservoir characteristic, the result shows that, to single well productivity forecasting, the superiority, duration and practical application of the new approach of transient well test based on coupling gas reservoir and well bore can not only be used to forecast by directly employing transient pressure test data, also, by determining formation parameters through production dynamic data matching, meanwhile, it can be used to study the different work procedure, the way of well completion and productivity change under the condition of improving EOR. The approach provides a advanced means to oil reservoir engineering research of depletion recovery.
Key words: productivity forecasting, transient, big slant well, coupling model, Luojiazhai
CLC Number:
TE332
DUAN Yong-gang CHEN Wei LI Yun HU Yong LUO Tao . A NEW APPROACH OF TRANSIENT PRODUCTIVITY FORECASTING IN LUOJIAZHAI GAS RESERVOIR[J]. 西南石油大学学报(自然科学版), 2007, 29(1): 64-67.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://journal15.magtechjournal.com/Jwk_xnzk/EN/10.3863/j.issn.1000-2634.2007.01.019
http://journal15.magtechjournal.com/Jwk_xnzk/EN/Y2007/V29/I1/64