西南石油大学学报(自然科学版) ›› 2013, Vol. 35 ›› Issue (1): 116-121.

• 石油与天然气工程 • Previous Articles     Next Articles

Study on the Adaptability Limits of Point Bar Potential Tapping byHorizontal Well at High Water Cut Stage

Li Junjian1, Liu Yuzhang1, Xiao Kang2, Jiang Hanqiao2   

  1. 1. Research Institute of Petroleum Exploration & Development(RIPED),PetroChina Company Limited,Haidian,Beijing 100083,China2. MOE Key Lab of Petroleum Engineering,China Petroleum University,Changping,Beijing 102249,China
  • Received:1900-01-01 Revised:1900-01-01 Online:2013-02-01 Published:2013-02-01

Abstract: Combined with geological and production performance data in 4 sand group of upper Ng in Gudao Oilfield,the threedimensional
typical model reflecting reservoir architecture of point bar is set up according to quantitative description of lateral
accretion interbed in point bar. Based on economic limit production of horizontal well,the methods of reservoir engineering
and numerical simulation are used to analyze the adaptability limits of point bar potential tapping by horizontal well at high
water cut stage on the basis of distribution modes of remaining oil under different injection-production patterns in point bar. The
result shows that when the dip direction of interbed is consistent with water injection,and permeability of interbed is less than
12 mD,dip angle is lower than 7°vertical extension length / reservoir thickness more than 0.46 and horizontal spacing less than
60 m,it is time to prepare for tapping the potential of horizontal wells. When the dip direction of interbed is opposite to water
injection,and the adaptability limits become 30 mD,11°,0.33 and 90 m respectively,it is time to carry out potential tapping.
Such results provide a certain theoretical guidance for application of horizontal wells in point bar at high water cut stage.

Key words: high water-cut stage, point bar, horizontal well, adaptability limit