西南石油大学学报(自然科学版) ›› 2008, Vol. 29 ›› Issue (4): 115-118.DOI: 10.3863/j.issn.1000-

• 石油与天然气工程 • Previous Articles     Next Articles

A PROBE INTO THE NEW TECHNOLOGY OF GAS PRODUCTION OF XUJIAHE GAS RESERVOIR IN WEST SICHUAN

CHEN Zhao-guo1,2   

  1. 1.State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation,Chengdu University of Technology,Chengdu Sichuan 610059,China;2.Southwest Petroleum Branch Company,SINOPEC,Chengdu Sichuan 610059,China
  • Received:1900-01-01 Revised:1900-01-01 Online:2008-08-20 Published:2008-08-20

Abstract:

Aiming at such production difficulties as deeply buried gas reservoirs,developed fractures,containing CO2,quick waterproducing in gas production and the production pipe string corrosion in Xujiahe reservoirs,west Sichuan,based on the factors that flow ability of formation fluid increase as the pressure difference increases,pipe string corrosion gets more severe as CO2 fractional pressure goes up,it is presented that in gas production,the critical productivity(maximum production pressure difference)can be used in proration to prolong the period of gas production without water,the down hole throttle technique used to decrease CO2 fractional pressure in gas production pipe string and the rate of the corrosion.The combination of the two ways can make both the proration reasonable,prolong the period of gas production without water,and ensure the control of production pressure difference,as well as decrease CO2 fractional pressure in well bore,the production efficiency will be increased.

Key words: deep well, gas production, fixed bottom hole pressure difference, throttle, waterless gas recovery period, Sichuan Basin

CLC Number: