西南石油大学学报(自然科学版) ›› 1998, Vol. 20 ›› Issue (4): 59-62.DOI: 10.3863/j.issn.1000-2634.1998.04.016

• 钻采工艺与设备 • Previous Articles     Next Articles

THE DEVELOPMENT OF DYNAMIC SIMULATION MODELS OF XJ350WORKOVER RIG’S HOISTING SYSTEM

HOU Yong-jun DU Xiao-ping AIZhijiu et al   

  1. Southwest PetroleumInst
  • Received:1998-06-12 Revised:1900-01-01 Online:1998-11-20 Published:1998-11-20

Abstract: In order to understand the dynamic behavior of workover rig’s hoisting system, and reduce the time of developing production equipment and testing expense, use ADAMS to set up dynamic simulation models of XJJ350 workover rig’s hoisting system in hoisting and feeding-off, when build these models,
discretelize the tubing or sucker - rod. Only make a little change about these models, they can be used to analyze the dynamic behavior in hoisting and feeding-off at different depths.It is proved that these models are feasible.

Key words: Workover Equipment, Hoisting System, Dynamic, Computerized Simulation, Model

CLC Number: