Journal of Southwest Petroleum University(Science & Technology Edition) ›› 2026, Vol. 48 ›› Issue (5): 124-134.DOI: 10.11885/j.issn.1674-5086.2025.04.07.01

• OIL AND GAS ENGINEERING • Previous Articles     Next Articles

Influence of Horizontal Well Structure on Gas-liquid Sand-carrying Flow in the Whole Wellbore

WAN Huaxu, ZHANG Yuhao, ZHAO Kunpeng, BAI Bofeng   

  1. State Key Laboratory of Multiphase Flow in Power Engineering, Xi'an Jiaotong University, Xi'an, Shaanxi 710049, China
  • Received:2025-04-07 Published:2026-11-03

Abstract: Sand production after large-volume fracturing in shale gas horizontal wells can easily cause wellbore sand plugging, making the study of gas-liquid-sand multiphase flow characteristics essential for sand control. Based on an actual gas well, a full wellbore configuration incorporating the perforated interval, horizontal section, deviated section (comprising build-up, hold, and drop-off segments), and vertical section was constructed, and the gas-liquid-sand three-phase flow was numerically investigated using the Eulerian multiphase model, focusing on the influence of wellbore geometry. The results show that sand transport is inherently driven by gas carrying liquid and liquid carrying sand. Intermittent sand dunes or sand beds form in the horizontal and deviated sections, and in the radial direction, high-velocity sand transport, movement of sand grains on the bed surface, a moving sand bed, and a stationary sand bed appear successively. In the vertical section, the sand distribution becomes uniform and backflow occurs. Sand accumulation in the deviated section originates from the stationary sand bed induced by wall shear and sand backflow from the vertical section; it exhibits the highest sand holdup, the thickest stationary sand bed, and the lowest sand transport velocity, making it the most severe sand deposition region in the wellbore. Longer horizontal and deviated sections make sand transport more difficult, whereas a smaller tubing string enhances the flow velocity and favors sand transport. The build-up section is the most likely location for sand plugging, and the risk increases with higher dogleg severity. This study provides theoretical support for drilling, sand control and plug removal, and enhanced recovery in shale gas horizontal wells.

Key words: gas-liquid sand carrying, horizontal well, shale gas, numerical simulation, well structure, gas-liquid-sand three-phase flow

CLC Number: