西南石油大学学报(自然科学版) ›› 2012, Vol. 34 ›› Issue (2): 99-104.

• 石油与天然气工程 • 上一篇    下一篇

煤层气井产气量控制因素分析

秦学成1,2,段永刚1,谢学恒2,曹亚芹2,康如坤3   

  1. 1. 西南石油大学石油工程学院,四川成都6105002. 中国石化华东分公司石油勘探开发研究院,江苏南京2100113. 中国石油华北油田公司,河北沧州,061000
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2012-04-01 发布日期:2012-04-01

Controlling Factor Analysis of Gas Production Rate in Coal Bed Gas Well

Qin Xuecheng1,2, Duan Yonggang1, Xie Xueheng2, Cao Yaqin2, Kang Rukun3   

  1. 1. School of Petroleum Engineering,Southwest Petroleum University,Chengdu,Sichuan 610500,China2. Research Institute of Petroleum Exploration & Development,East China Company,SINOPEC,Nanjing,Jiangsu 210011,China3. Huabei Oilfield Company,CNPC,Cangzhou,Hebei 061000,China
  • Received:1900-01-01 Revised:1900-01-01 Online:2012-04-01 Published:2012-04-01

摘要: 结合沁水盆地东北部和顺区块煤层气井排采经验,分别从地质因素(构造位置、陷落柱、断层等)、工程因素(水
力压裂的缝高控制、裂缝半长等)和排采因素(排液速度、套压控制、停电停抽等)三个方面探讨了该区块煤层气井产气量
的控制因素。研究发现:该区块煤层气井产气量受构造位置的影响较大,与陡坡带的距离和煤层含气量呈现明显的相关
性;区块高构造部位水力压裂易出现压开含水层及井间压窜现象;见气时套压的控制与产气量具有一定规律,套压小于
0.5 MPa 开井产气,效果最差,套压0.51.0 MPa 开井产气,效果次之,套压大于1.0 MPa 开井产气,效果最好。

关键词: 煤层气井, 排采, 产气量, 控制因素, 对策

Abstract: With consideration of experience of discharge water and gas production in coal bed gas wells,Heshun block in
northeastern Qinshui Basin,we study controlling factors of gas production rate in coal bed gas well in this block from following
aspects:geological factors(structural location,swallow pillar and fault etc.),engineering factors(controlling of fracture height
of hydraulic fracturing,half length of fracture and etc.)and discharge water and gas production factors(rate of delivery,casing
pressure controlling,power off and stop production and etc.). The conclusions can be drawn:first,gas production in coal bed
gas well is controlled by structural location to large extent. Second,distance between well and actic region and gas content in
coal bed are correlative apparently. Third,hydraulic fracturing in higher structural location is easily subjected to fracturing pay
zone and communication between wells. Fourth,when gas break through,controlling of casing pressure and gas production
rate have some rules. When casing pressure is less than 0.5MPa,the effect is worst;when casing pressure is between 0.5 MPa-
1.0 MPa,the effect better;when casing pressure is greater than 1.0 MPa,the effect is the best. According to the research results,
strategies and advice are put forward to guide future work on the block,which we hope to contribute to future exploration and
development of coal bed gas.

Key words: coal bed gas well, exploit, gas production rate, controlling factor, countermeasure

中图分类号: