[1] 孙贺东,常宝华,张静楠,等. 裂缝性致密砂岩气藏出砂原因及对产气量的影响——以塔里木盆地克深气田为例[J]. 天然气工业, 2018, 38(11):52-58. doi:10.3787/j.issn.1000-0976.2018.11.006 SUN Hedong, CHANG Baohua, ZHANG Jingnan, et al. Causes of sand production and its influence on the output of fractured tight sandstone gas reservoirs:A case study on the Keshen Gas Field, Tarim Basin[J]. Natural Gas Industry, 2018, 38(11):52-58. doi:10.3787/j.issn.1000-0976.2018.11.006 [2] OHEN H A. Calibrated wireline mechanical rock properties model for predicting and preventing wellbore collapse and sanding[C]. SPE 82236-MS, 2003. doi:10.2118/82236-MS [3] NOURI A, VAZIRI H, KURU E, et al. A comparison of two sanding criteria in physical and numerical modeling of sand production[J]. Journal of Petroleum Science and Engineering, 2006, 50:55-70. doi:10.1016/j.petrol.2005.10.003 [4] 吕广忠,陆先亮,栾志安,等. 油井出砂预测方法研究进展[J]. 油气地质与采收率, 2002(6):55-58. doi:10.3969/j.issn.1009-9603.2002.06.020 LÜ Guangzhong, LU Xianliang, LUAN Zhian, et al. Research progress of sanding prediction method of oil wells[J]. Petroleum Geology and Recovery Efficiency, 2002, 9(6):55-58. doi:10.3969/j.issn.1009-9603.2002.06.020 [5] VAN DEN HOEK P, HERTOGH G, KOOIJMAN A, et al. A new concept of sand production prediction:Theory and laboratory experiments[J]. SPE Drilling Completion, 2002, 15(4):261-273. doi:10.2118/65756-PA [6] MORITA N, WHITFILL D L, MASSIE I, et al. Realistic sand-production prediction:Numerical approach[J]. SPE Production Engineering, 1989, 4(1):15-24. doi:10.2118/16989-PA [7] MORITA N, WHITFILL D L, FEDDE O P, et al. Parametric study of sand production prediction:Analytical approach[J]. SPE Production Engineering, 1989, 4(1):25-33. doi:10.2118/16990-PA [8] MORITA N, WHITFILL D L, NYGAARD O, et al. A quick method to determine subsidence, reservoir compaction and in-situ stress induced by reservoir depletion[J]. SPE 17150-PA, 1989. doi:10.2118/17150-PA [9] MORITA N, FUH G F. Prediction of sand problems of a horizontal well from sand production histories of perforated cased wells[C]. SPE 48975-MS, 1998. doi:10.2118/48975-MS [10] NWABUEZE V O, ONIKOYI A S, NIGERIA S. Sanding in oil well reservoir completions[C]. SPE 163010MS, 2010. doi:10.2118/163010-MS [11] VOLONTE G, SCARFATO F, BRIGNOLI M. Sand production prediction:A practical finite-element 3D approach for real field applications[C]. SPE 134464-MS, 2010. doi:10.2118/134464-MS [12] GEERTSMA J. Some rock mechanical aspects of oil and gas well completions[J]. SPE 8073-PA, 1987. doi:10.2118/8073-PA [13] VAZIRI H, ROBBIE A, KIDD G, et al. Sanding:A rigorous examination of the interplay between drawdown, depletion, start-up frequency and water cut[C]. SPE 89895MS, 2004. doi:10.2118/89895-MS [14] ISPAS I, BRAY AR, PALMER I D, et al. Prediction and evaluation of sanding and casing deformation in a GOMShelf well[J]. SPE 87842-JPT, 2005. doi:10.2118/87842JPT [15] KHAKSAR A, RAHMAN K. Integrated geomechanical study for hole stability, sanding potential and completion selection:A case study from South East Asia[C]. SPE 115915-MS, 2008. doi:10.2118/115915-MS [16] ELYASI A, GOSHTASBI K. Using different rock failure criteria in wellbore stability analysis[J]. Geo-mechanics for Energy and the Environment, 2015, 2:5-21. doi:10.1016/j.gete.2015.04.001 [17] DOI M, MURAKAMI T, UEDA Y, et al. Field application of multi-dimensional diagnosis of reservoir rock stability against sanding problem[C]. SPE 64470-MS, 2000. doi:10.2523/64470-MS [18] AL-AJMI A M, ZIMMERMAN R W. Stability analysis of vertical boreholes using the Mogi-Coulomb failure criteria[J]. International Journal of Rock Mechanics and Mining Sciences, 2006, 43(8):1200-1211. doi:10.1016/j.ijrmms.2006.04.001 [19] HOEK E, BROWN E T. Empirical strength criterion for rock masses[J]. Journal of Geotechnical and Geo-environmental Engineering, 1980, 106(9):1013-1035. doi:10.1016/0148-9062(81)90766-X [20] DRUCKER D, PRAGER W. Soil mechanic sand plastic analysis or limit design[J]. Quarterly of Applied Mathematics, 1952, 10:157-165. doi:10.1090/qam/48291 [21] EWY R T. Wellbore stability predictions by use of a modified Lade criterion[J]. SPE Drilling Completion, 1999, 14(2):85-91. doi:10.2118/56862-PA [22] AL-AJMI A M, ZIMMERMAN R W. Relationship between the parameters of the Mogi and Coulomb failure criterion[J]. International Journal of Rock Mechanics and Mining Sciences, 2005, 42(3):431-439. doi:org/10.1016/j.ijrmms.2004.11.004 [23] MOGI K. Effect of the intermediate principal stress on rock failure[J]. Journal of Geophysical Research, 1967, 72(20):5117-5131. doi:10.1029/jz072i020p05117 [24] AL-SHAAIBI S K, AL-AJMI A M, AL-WAHAIBI Y. Three dimensional modeling for predicting sand production[J]. Journal of Petroleum Science and Engineering, 2013, 109:348-363. doi:10.1016/j.petrol.2013.04.015 [25] 梁何生,闻国峰,王桂华,等. 孔隙压力变化对地应力的影响研究[J]. 石油钻探技术, 2004, 32(2):18-20. doi:10.3969/j.issn.1001-0890.2004.02.006 LIANG Hesheng, WEN Guofeng, WANG Guihua, et al. The effects of pore pressure alterations on the insitu stress[J]. Petroleum Drilling Techniques, 2004, 32(2):18-20. doi:10.3969/j.issn.1001-0890.2004.02.006 [26] 张传进,鲍洪志,路保平. 油气开采中岩石力学参数变化规律试验研究[J]. 石油钻采工艺, 2002, 24(4):32-34. doi:10.3969/j.issn.1000-7393.2002.04.011 ZHANG Chuanjin, BAO Hongzhi, LU Baoping. Experimental study on the changing tendency of rock mechanics parameters in oil & gas production[J]. Oil Drilling & Production Technology, 2002, 24(4):32-34. doi:10.3969/j.issn.1000-7393.2002.04.011 [27] 王学滨. 孔隙压力对岩样全部变形特征的影响[J]. 沈阳建筑大学学报(自然科学), 2005, 21(6):625-629. doi:10.3969/j.issn.2095-1922.2005.06.006 WANG Xuebin. Effect of pore pressure on entire deformational characteristics of rock specimen[J]. Journal of Shenyang Jianzhu University (Natural Science), 2005, 21(6):625-629. doi:10.3969/j.issn.2095-1922.2005.06.006 [28] 许江,杨红伟,李树春,等. 循环加卸载孔隙水压力对砂岩变形特性影响实验研究[J]. 岩石力学与工程学报, 2009, 28(5):892-899. doi:10.3321/j.issn:1000-6915.2009.05.004 XU Jiang, YANG Hongwei, LI Shuchun, et al. Experimental study of effects of cyclic loading and unloading pore water pressures on deformation characteristic of sandstone[J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28(5):892-899. doi:10.3321/j.issn:1000-6915.2009.05.004 |