西南石油大学学报(自然科学版) ›› 2012, Vol. 34 ›› Issue (4): 158-164.

• 石油机械工程及其他 • 上一篇    下一篇

气体钻井中钻柱力学性能及冲蚀实验研究

李东洋1,王垒超1,张涛2,王钱钱1   

  1. 1. 西南石油大学研究生院,四川成都6105002. 西南石油大学石油工程学院,四川成都610500
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2012-08-01 发布日期:2012-08-01

Experimental Research on Mechanical Properties and Erosion of the DrillString in Gas Drilling

Li Dongyang1, Wang Leichao1, Zhang Tao2, Wang Qianqian1   

  1. 1. Graduate School of South Petroleum University,Chengdu,Sichuan 610500,China2. School of Petroleum Engineering,Southwest Petroleum University,Chengdu,Sichuan 610500,China
  • Received:1900-01-01 Revised:1900-01-01 Online:2012-08-01 Published:2012-08-01

摘要: 由于在破岩过程中受到冲击,气体钻井中的钻柱产生了交变应力,而钻柱旋转加剧了交变应力的变化,同时
气体携带岩屑对钻柱产生冲蚀,加速了钻柱的失效。钻柱主要失效形式为疲劳断裂,这跟钻柱所受应力大小及变化密
不可分,因此,开展气体钻井过程中钻柱力学性能和冲蚀研究,掌握钻柱应力变化规律及岩屑对钻柱的冲蚀规律,是减
小和防止钻柱失效的基础工作,对增加气体钻井过程中的安全性和降低钻井成本有十分重要的意义。通过使用一种
已开发出的可同时模拟气体钻井钻具振动和冲蚀的装置,进行了不同钻具组合情况下,气体钻井钻柱同时受振动和冲
蚀实验。实验结果表明,气体钻井过程中,配置扶正器将使钻柱所受交变应力值变化范围降低40% 以上,扶正器和减
振器的配合使用将使交变应力值变化范围下降50%,因此,扶正器和减振器的配合使用,将大幅降低钻柱所受交变应
力,并延长交变应力作用周期,从而降低钻柱失效的概率。

关键词: 气体钻井, 力学性能, 实验研究, 交变应力, 冲蚀振动

Abstract: The drill sting for the gas drilling is impacted in the process of crushing rock,so the alternating stress occurre.
Alternating stress changes is aggravated by the rotating drill string,and the drill string is also erosion by debris,so the failure
is accelerated. The main failure form of drill string is fatigue fracture,which is inseparable from the drill string,so the research
on mechanical properties and erosion of the drill string in gas drilling,mastering the drill string stress change rules and erosion
law of drill string are the basic work to reducing and preventing the drill string failure. This work has very important meaning
for increasing the safety and reducing the cost in gas drilling. The drill string of gas drilling in the situation of vibration and
erosion in the case of different combination drilling tools by using an experiment device which can simulate the situation is
studied in this paper. The experiment shows that using centralizer will reduce the alternating stress value range up to 40%,and
using centralizer and shock absorber at the same time will reduce the alternating stress value range up to 50%. The centralizer
and the shock absorber used together will reduce the alternating stress greatly and extend the alternating stress function cycle,
thus the probability of failure of the drill string will be reduced.

Key words: gas drilling, mechanical properties, experimental research, alternating stress, vibration and erosion

中图分类号: