西南石油大学学报(自然科学版) ›› 2003, Vol. 25 ›› Issue (3): 19-21.DOI: 10.3863/j.issn.1000-2634.2003.03.006

• 石油与天然气工程 • Previous Articles     Next Articles

HIGH-VELOCITY AND HIGH-EFFICIENCY DEVELOPMENT TECHNOLOGY OF LOW-SUPER LOW PERMEABILITY RESERVOIR IN BLOCK WEI-2

MA Xin-ben CAI Gang WANG Zhi-yuen
  

  1. Jiangsu Oil Field, Jinhu Jiangsu 211623,China
  • Received:2002-06-03 Revised:1900-01-01 Online:2003-06-20 Published:2003-06-20
  • Contact: MA Xin-ben

Abstract: The average permeability of block Wei-2 is (6.1~13.5) ×10-3μm2, it is a comparatively integral low and super-low permeability reservoir. In the process of developing block Wei2, we took advantage of various development technologies, including reasonable development well pattern, synchronous water injection and oil production, improving injection-production system continually, intensifying adjustment and control of injection-production and reservoir stimulation. From the beginning of development, the field maintains a very good situation of high and stable productivity. The recovery velocity keeps at 1.9%~2.0% in five years, the comprehensive water cut is well controlled below 18% and all kinds of development indexes are significantly better that what they are in development plan.This paper mainly aims at introducing the measures to attainhigh-velocity and high-efficiency development at block wei-2
and the effect.


Key words: block Wei-2, low permeability, synchronous injection-production, high-velocity and high-efficiency, development technology, effectiveness

CLC Number: