西南石油大学学报(自然科学版) ›› 2005, Vol. 27 ›› Issue (5): 51-52,6.DOI: 10.3863/j.issn.1000-2634.2005.05.14
• 石油与天然气工程 • Previous Articles Next Articles
MIAO Guo-zheng WANG Xian-xian WU Jian-fu et al
Received:
Revised:
Online:
Published:
Abstract: Because ofweak pressure conductive ability in high-pressure and low-permeability reservoir, pressure builds up slowly when the oilwell shutdown, and well killing fluid density, according to formation pressure, is higher, resulting in formation damage. In this article, through analyzing pressure build-up speed of the reservoir, thewriterdetermines the appropriate well killing fluid densities which are suitable for different pressure build-up speed and operating cycle. Great effects and economic benefithave been achieved by in-site application, and the reference can be provided for the well killing fluid density optimization in the similar reservoirs.
Key words: high-pressure and low-permeability, pressure conductive ability, pressure build-up, well killing fluid density, operation cycle
CLC Number:
TE257. 9
MIAO Guo-zheng WANG Xian-xian WU Jian-fu et al. APPLICATION OF PRESSURE BUILD-UP CURVE IN HIGH-PRESSURE, LOW-PERMEABILITY RESERVO IR W ELL K ILLING FLUID DENSITY OPTIMIZATION PROCESS[J]. 西南石油大学学报(自然科学版), 2005, 27(5): 51-52,6.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://journal15.magtechjournal.com/Jwk_xnzk/EN/10.3863/j.issn.1000-2634.2005.05.14
http://journal15.magtechjournal.com/Jwk_xnzk/EN/Y2005/V27/I5/51