西南石油大学学报(自然科学版) ›› 2012, Vol. 34 ›› Issue (4): 100-104.

• 石油与天然气工程 • Previous Articles     Next Articles

The New Calculation Method of Condensate Gas Well Production andReservoirs

Liao Faming1, Miao Jijun1, Chen Wenlong1, Deng Jun1, Wang Nutao2   

  1. 1. Natural Gas Project Department of Tarim Oilfield Company PetroChina,Korla,Xingjiang 841000,China2. School of Petroleum Engineering,Southwest Petroleum University,Chengdu,Sichuan 610500,China
  • Received:1900-01-01 Revised:1900-01-01 Online:2012-08-01 Published:2012-08-01

Abstract: Complex phase change and re-distribution exist in gas condensate reservoir. It will produce gas condensate in
formation and the wellbore,respectively,when the pressure drop to below dew point pressure,resulting in the conversion
of mass between wellhead and bottom hole in gas production and oil production,but still follows the law of conservation of
total mass. Therefore,according to mass conservation principle,we established the oil and gas two-phase flow equations. By
introducing the two-phase pseudo-pressure function,unstable deliverability equation was derived. On this basis,we fit the
entire history of production by taking material balance equation and production data into consideration. With this method we
not only get the current gas production,but a variety of formation pressure and formation parameters. An example is then
analyzed to verify the accuracy and reliability,the method is conducive to the promotion the use of gas condensate.

Key words: gas condensate reservoir, two-phase pseudo-pressure, material balance, production, reserve

CLC Number: