西南石油大学学报(自然科学版) ›› 2012, Vol. 34 ›› Issue (5): 133-136.

• 石油与天然气工程 • Previous Articles     Next Articles

A Study on Different Completion Methods of Horizontal Well Productivity

Zhao Haiyang1, Wu Lankexi2, Liu Qingshan1, Sun Tongcheng1   

  1. 1. The Oil Gas Project Management Office of Sinopec Northwest Oilfield Branch Company,Urumqi,Xinjiang 830011,China2. College of Geophysics and Information Engineering,China University of Petroleum,Changping,Beijing 102249,China
  • Received:1900-01-01 Revised:1900-01-01 Online:2012-10-01 Published:2012-10-01

Abstract: With the development of drilling and completion technology,horizontal wells are more widely used in bottom water
reservoir as an effective way to increase productivity and reduce costs,while problems arise in the production process,which
mainly are shorter anhydrous harvest period led by water coning,and faster cut rising. Besides,completion method doesn’t
meet the requirements of the development and capacity prediction is not accurate,either. Based on the summarization of stable
horizontal well productivity prediction models,this paper uses the horizontal well productivity prediction mathematical model
under the action of the wellbore and reservoir coupling,and solves finite conductivity vertical fracturing wells pressure with
Cinco H’s dynamic calculation method,then the model of production forecast is established. The model takes the bottom water
drive reservoir horizontal well into account,and carries out the productivity prediction in different completion mode after the
decomposition calculation of skin factor in different completion mode. The results of these studies have important guiding
significance for the optimization of horizontal well completion as well as the study of horizontal well reservoir engineering.

Key words: horizontal well, productivity prediction, transient state, coupling model, skin factor