西南石油大学学报(自然科学版) ›› 2010, Vol. 32 ›› Issue (2): 101-107.DOI: 10.3863/j.issn.1674-5086.2010.02.020

• 石油与天然气工程 • Previous Articles     Next Articles

OPTIMIZATION OF THE INJECTION AND PRODUCTION SCHEMES DURING CO2 FLOODING FOR TIGHT RESERVOIR

LI Bao-zhen1,2 LI Xiang-fang1 Kamy Sepehrnoori2 YAO Yue-dong1   

  1. 1.MOE Key Laboratory of Petroleum Engineering,China University of Petroleum,Changping Beijing 102249,China;2.Department of Petroleum Geology,University of Texas,Austin,TX 78712,USA
  • Received:1900-01-01 Revised:1900-01-01 Online:2010-04-20 Published:2010-04-20

Abstract:

Due to the tight nature of low-permeability reservoir,recoveries from depletion,water flooding and normal EOR methods are greatly limited.However,gases like CO2 with lower viscosity have higher injectivity which can co-optimize oil recovery and CO2 sequestration.In this study,reservoir engineering analysis and simulations are performed to investigate the best injection and production schemes in tight reservoirs among continuous gas injection,water alternative gas injection and producer control according to GOR and average reservoir pressure,periodical injection and production,improved well control production method,etc.The three objective functions are oil recovery,amount of CO2 sequestered and net present value.Result shows that continuous CO2 injection by using directional injectors coupled producers′ well control method according to oil well static pressure and gas oil ratio is the best scheme during CO2 flooding in tight reservoirs,which can give higher oil recovery and the most CO2 sequestration with higher injectivity,shorter developing period

and feasibility.

Key words: tight reservoir, CO2 flooding, EOR, sequestration, injection-production schemes

CLC Number: