西南石油大学学报(自然科学版) ›› 2002, Vol. 24 ›› Issue (1): 34-36.DOI: 10.3863/j.issn.1000-2634.2002.01.011

• 油藏经营管理 • Previous Articles     Next Articles

GEOLOGY-ENGINEERING-ECONOMICS SYNERGY AP PLICATION IN COMPLEX FAULT BLOCK IN RESERVOI DEVELOPMENT

ZENG Xiang-lin1 DU Zhi-min2 CHEN Xiao-fan3 et al. 

  

  1. (Southwest Petroleum Institute, Nan-chong Sichuan 637001, China)
  • Received:2001-09-21 Revised:1900-01-01 Online:2002-02-20 Published:2002-02-20
  • Contact: ZENG Xiang-lin

Abstract: Aimed at the existing problems in the Namazhuang water-flooding field development, multi-disciplinary reservoir manage-ment team is established. The team combines the dynamic and static research work through close the geology-engineering-eco-nomics cooperation, both the aquifer source’s size and the clos-ing of fault, which can not determined by geologic study solely,
are re-recognized by using reservoir engineering dynamic analy-sis and numerical simulation. In this way, the more accurate three-dimension geologic model is acquired. So, this paper of-fers an effective reservoir management method to the exploita-tion adjustment and development of potential in the water-flood-ing complex fault field.

Key words: reservoir management, complex fault blocks, geology model, numerical simulation, synergy

CLC Number: