西南石油大学学报(自然科学版) ›› 2002, Vol. 24 ›› Issue (2): 15-17.DOI: 10.3863/j.issn.1000-2634.2002.02.005
• 石油工程 • Previous Articles Next Articles
LIU Da-lin1 LI Zhi-ping2 LI Yun2.
Received:
Revised:
Online:
Published:
Contact:
Abstract: Well testing is a simple and direct way to determine the deliverability of gas well. However, whether the test duration is long enough or not will affect the readings from the test, which will in turn influence the computation of gas well deliverability.Based on the deep gas well configuration, we investigated themethod, the principle and other factors to estimate the reason-able testing time. We presented a couple of ways to estimate the reasonable testing time, and case study was also provided. We think that our research work is of practical significance in guid-ing test design of deep gas wells.
Key words: well testing, test duration, determination, deep gas well
CLC Number:
TE373
LIU Da-lin LI Zhi-ping LI Yun. . DETERMINATION OF REASONABLE TESTING DURA-TION FOR DEEP GAS WELL[J]. 西南石油大学学报(自然科学版), 2002, 24(2): 15-17.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://journal15.magtechjournal.com/Jwk_xnzk/EN/10.3863/j.issn.1000-2634.2002.02.005
http://journal15.magtechjournal.com/Jwk_xnzk/EN/Y2002/V24/I2/15